Passage: Farndon to Grimsby  - Friday 20th June 2008 A long day with 3 locks, very low bridges and lots of shallow water to navigate, finishing with a plotted cruise down the River Humber to Grimsby Fish Dock.
Leg Description Plan
1 Departure: 0600hrs leg1 Complete
  Fanrdon Marina to Cromwell Lock (Non Tidal)
2 0900hrs - 1300hrs leg2 Complete
  Cromwell Lock to Gainsborough (Tidal)
3 1600hrs to 2130hrs leg3 Alternative...Hull Marina
  Gainsborough to Grimsby (Tidal)
Images Attachments
2   3   4   5   6  
 
 
               
1   7   8   9